Cutting Red Tape review
On 2 December 2015, the government launched a new 'Cutting Red Tape' review in an effort to get housebuilders’ views on the ineffective rules and heavy-handed enforcement that hold back the building of homes.
The review will seek to highlight the issues that are of most concern to housebuilders, will attempt to understand the unique pressure faced by smaller firms. It will also re-examine the recent changes made to the Construction, Design and Management (CDM) Regulations, and other EU rules that are perceived to be too strictly implemented.
The wide-ranging review, which builds on the work of the Housing Implementation Task Force, will attempt to encompass the experiences of all those involved in building homes, such as developers, planners and trade associations.
The priorities identified by the Task Force that will serve as the review’s starting points are:
- Roads and infrastructure rules for new housing developments.
- Environmental requirements, particularly wider EU environmental permit requirements.
- Rules that affect utilities, such as electricity, gas and water – as well as broadband infrastructure.
The Business Secretary Sajid Javid said: “This review will give housebuilders and smaller construction businesses a powerful voice as part of our £10 billion deregulation drive. Where rules are too complicated, ineffective or poorly enforced, I want to hear about it and the government will take action. Together we can cut red tape and get Britain building.
"Previously, the Housing and Construction Red Tape Challenge delivered significant reforms and led to a review of local housing standards by the Department for Communities and Local Government.”
The Housing Minister Brandon Lewis said: “We are determined to remove barriers faced by housebuilders to ensure we continue to keep Britain building as quickly and safely as possible. We want to hear the views of firms big and small so we can remove unnecessary red tape and help housebuilders do what they do best, building the homes we need.”
John Allan, National Chairman of the Federation of Small Businesses, said: “The government is right to listen to the needs of smaller businesses. In the 1980s, smaller house builders delivered around two thirds of our new homes. Today, it is less than a third. If the government can encourage small firms back into house building, that would be a major step towards meeting this country’s housing needs.”
Stewart Baseley, Executive Chairman of the Home Builders Federation, said: “As the industry looks to drive further increases in housing supply we welcome moves to reduce unnecessary regulation and the associated costs. Aside from the planning system there are significant other regulatory processes and charges levied on the industry that can adversely affect viability, but also, critically, delay the ability of home builders to get on site and start building. Reducing red tape will bring more sites into play more quickly and so help the industry deliver more desperately needed homes in the coming years.”
The review closed for comment on 13th January 2016.
Featured articles and news
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.


























